TOEIC ETS

Ứng dụng tự học luyện thi TOEIC hiệu quả

SOIL CONTAMINATION REPORT April 5 Client: Gould Manufacturing Testing Performed By: Soil-Check Solutions Testing Dates: March 3, May 5, July 2, September 5 Process: Samples were collected from various points at Site 1 (Lancaster), Site 2 (Canton), and Site 3 (Brockway) at a depth of 6 cm and 10 cm. The soil was tested for contaminants, and the levels were compared to assess changes over time. Following the initial test, micro-organisms were introduced at all sites. Preliminary Findings and Recommended Actions: Contamination levels at Site 1 dropped significantly. No further action is needed. At Site 2, a soil stabilization formula should be injected into the ground. This will dry into a hardened solid, which can then be removed by specialized equipment. Micro-organisms should be reapplied. At Site 3, the grass and shrubs should be pulled from the soil, and micro-organisms should be reapplied.
What is true about the soil testing?

Explanation:

Đáp án đúng là D.

Giải thích:

Báo cáo cho thấy các ngày lấy mẫu là March 3, May 5, July 2, September 5, có khoảng cách thời gian giữa các ngày thu thập mẫu.

Dịch câu hỏi và các lựa chọn:

Câu hỏi: Điều gì đúng về việc kiểm tra đất?

A. Nó đáp ứng yêu cầu của chính phủ

B. Nó được thực hiện bởi nhân viên toàn thời gian của Gould Manufacturing

C. Nó chủ yếu tập trung vào địa điểm Canton

D. Nó có khoảng cách giữa các ngày thu thập mẫu (đáp án đúng)